- reimplement using a sparecell
- reimplement using newest open_pdks
!important using openlane pre odb with some local patches which
most if not all are merged in the current head of openlane however
still takes effort to update the interactive script to be latest
openlane compatible
!important override abstract lef generated by openlane. openlane
generates lef and mag that contain def BLOCKAGE layers that cause
congestions during top level routing
~ update the following views:
def
mag
verilog
spef(all corners)
+ add the ability to override the interactive script filename
+ add the ability to run openlane regression using regression.config
file
~ change GRT ADJUSTMENT values
~ change pointers to some files for workarounds
!important the interactive script still needs updates
!important this was done using old openlane v0.22 and its matching
pdk
!important known workarounds:
- a custom techlef is used where large metal spacing rules are the
only ones present to avoid violations by the router
- some odd behaviour happening when a macro has a lef view
with a non zero origin. so the power routing cell is (temporarily)
modified to have a zero origin and its placement has been shifted
which doesn't match the power routing mag.
- the old openlane doesn't generate multi spef corners. they
are generated using timing-scripts repo
view of constant_block which was recently merged into the repository.
The constant_block instance positions and connections were modified
slightly to avoid routing over obstruction areas.
fork of caravel (layout .mag file not copied into this commit).
The layouts of both chip_io and chip_io_alt are believed to be
complete, but need verification (with LVS).
includes RTL change inside the padframe definition to remove one
previously unnoticed hard-wired connection between VDDIO and a
3.3V domain digital input pin.
- rtl updated
~ add one column to the right to pass placement congestion
~ density adjusted (probably has no effect)
+ manually add isosubstrate layer in mag and gds from older iterations
!important still need to run dynamic simulations
!important depends on some updates to openlane
!important need to be able to recreate using newer openlane versions
the left hand side of caravan from gpio_defaults_block_14 to
gpio_defaults_block_25. Otherwise, the script that generates the
custom user configuration won't be able to change the defaults
for GPIO 25.
- high level changes:
* add larger buffers on output ports
* add buffers on input ports
* adjust sdc file increasing output load and setting a high transition
- detailed changes:
* add interactive script for openlane where the order of events is a bit shuffled
- to add obstruction before pdn
- to manually insert buffers on some ports
- to manually remove buffers inserted by synthesis on for example serial_clock_out
* change openlane config adding extra row and columns to increase the space and fit the
added buffers
* change config to enable buffering
* increase density for better placement?
* change the cell exclude list. some excluded cells didn't make sense
* ef decap cells break dynamic sims?
* add custom pdn script for to duplicate the old pdn
- misc changes:
* fix openlane makefile to properly detect interactive script
!important still need to run dynamic simulations
!important depends on some updates to openlane
update gpio_control_block config for new openlane versions:
- disable `SYNTH_BUFFERING` and `SYNTH_SIZING` to limit the design size
and fit the floorplan
- change `SYNTH_STRATEGY` to `AREA 0` to minimize design cells
- disable `PL_RESIZER_TIMING_OPTIMIZATIONS` and
enable `GLB_RESIZER_TIMING_OPTIMIZATIONS`
- remove `FP_IO_*` and replace them with `FP_DEF_TEMPLATE` for io placement
- set `DECAP_CELL` to not use ef decaps.. i think that was for simulations?
- enable some turned off `QUIT_*` variables
- replace deprecated variables such as `GLB_RT_*`
- customize `pdn.tcl` to force pdn straps to follow the old pattern
- replace `$script_dir` with `$::env(DESIGN_DIR)`
!IMPORTANT - still need to run dynamic simulations
tweak blackbox lvs scripts for very fast extract; update spi/lvs/*.spice.
The .spice (once propagated to caravel-lite AND caravel-lite embed in mpw_precheck docker)
will pass the consistency check.
Co-authored-by: Risto Bell <rb@efabless.com>
* Fix the simple_por to (logically) isolate the 1.8V and 3.3V grounds.
This commit does the following:
(1) Corrects the xschem simple_por schematic to separate the 1.8V and 3.3V grounds.
(2) Corrects the xschem simple_por symbol to separate the 1.8V and 3.3V grounds.
(3) Corrects the xschem testbench to connect to both grounds of simple_por.
(4) Corrects the simple_por layout to remove the 1.8V logic from the
3.3V ground and connect it instead to the 1.8V ground.
(5) Extends the top-level power routing of caravel and caravan to
make a better connection to the simple_por 1.8V ground.
(6) Adds an LVS script to properly check the simple_por layout against the
xschem-generated schematic netlist.
NOTE: None of these modifications change the function of any circuit. The
1.8V and 3.3V ground nets are only logically separated in the netlists but
share the substrate. This fix cleanly defines the 1.8V and 3.3V grounds
within the simple_por, where they were previously mingled. It also ensures
that the full LVS for caravel and caravan can now include the simple_por at
the transistor level and still pass.
* Updated the GDS of simple_por (previously did not remove GDS_FILE
from the .mag file and so it just overwrote the original GDS file
with itself).
* Corrected a route to simple_por in the top level of both caravel
and caravan that was shorting to the extra metals put on top of
the substrate contact across the top (bottom, in the top level)
of the simple_por layout.
does not pass through an inverter, so that the input can remain
unconnected. Rewired the existing implementation to use an
alternative gate that has an inverting input so that the
user_gpio_out signal can be left undriven when the GPIOs are in
the management enable state. This is a simple logic refactoring
and does not change the logic function. The manual rewiring has
been confirmed by LVS, but at least one GL simulation should be
run to confirm that the logic function remains the same as before.
* Corrects four signals which were missing from the caravan top level
(management output and output enable to GPIO 0 and 1---these errors
would have prevented the houskeeping SPI from working on caravel).
Corrected RTL verilog (source of the error), GL verilog, and layout.
* Apply automatic changes to Manifest and README.rst
Co-authored-by: RTimothyEdwards <RTimothyEdwards@users.noreply.github.com>
* Create lvs-cvc.rst
* user_project_analog_wrapper -> user_analog_project_wrapper
* Added table
* Update lvs-cvc.rst
* Create lvs_cvc_mpw4.rst
Initial steps for LVS and CVC-RV for MPW-4 slot-002
* Update lvs_cvc_mpw4.rst
diode and short errors
* daily progress
`simple_por` changes to `caravel.v`
* Update lvs_cvc_mpw4.rst
* Changed int (truncate) to round to correct gpio_default error.
* Replace gpio_defaults_block for gpio 0-4 correctly.
Remove old versions of gpio_defaults_block 0403 and 1803.
* Removed local CVC-RV docs not ready for commit.
* Quick fix to a route that was hand-corrected from an Openlane
short but which is just shy of the minimum width for metal4.
* Apply automatic changes to Manifest and README.rst
Co-authored-by: RTimothyEdwards <RTimothyEdwards@users.noreply.github.com>
* (1) Modified the .magicrc file to set a default for PDK if not set in the
environment. (2) Fixed the user ID programming layout to not leave holes
behind when the script moves the vias around (similar to the handling of
the GPIO defaults block). (3) Added substrate isolation to gpio_control_block
and fixed the path references to the standard cells. (4) Fixed the four
missing routes on the Caravan top level. (5) Reinstated the large rendered
labels for the pads on both caravel and caravan. (6) Corrected the top
level gate-level netlist for caravan to add the missing pins to the
management core wrapper. (7) Did the same for the caravan top level RTL.
(8) Created scripts to run full LVS including extracting the management
core wrapper and reading all gate-level verilog submodules. (9) Moved all
of the LVS scripts to the scripts directory.
* Apply automatic changes to Manifest and README.rst
* Made the changes from pull request #73 as they did not get merged
successfully, and if merged now they will generate conflicts with
this pull request in scripts/set_user_id.py. So it's easier to
just manually add them to this pull request.
* Apply automatic changes to Manifest and README.rst
Co-authored-by: RTimothyEdwards <RTimothyEdwards@users.noreply.github.com>
* - update caravan configuration
* change correct gpio_default blocks instance names
* implement powerrouting work around
* place spare logic blocks
* keep the history of runs and sym link last/final one
* - update caravan mag, def and gl views
- add fake power routing cell in the rtl as a placeholder for openlane
to prevent routing on that cell
- fix some syntax errors in chip_io_alt
- match simple_por lef pins with mag by regenerating it
* Apply automatic changes to Manifest and README.rst
* add caravan power routing lef
* - update mag and def view of caravan
- add_macro_placement for fake cell
* Added back the power routing to Caravan, fixed DRC errors, ran LVS,
corrected placement of isolated substrate regions, and replaced the
signal routing for the analog lines. Be aware that merging with
main may cause issues with the mgmt_protect.mag file and its
subcells mprj2_logic_high.mag and mprj_logic_high.mag. It may be
worth cherry-picking the files to merge and exclude those layouts.
Co-authored-by: kareem <kareem.farid@efabless.com>
Co-authored-by: kareefardi <kareefardi@users.noreply.github.com>
Co-authored-by: Jeff DiCorpo <42048757+jeffdi@users.noreply.github.com>
Still evaluating why the layout does not pass LVS like it did
previously, although all current LVS errors appear to be related
to magic's extraction of the isolated substrates, and do not
imply functional issues. Also, LVS has only been done on the
top level.
* REVERT ME: temporarily match simple_por pin in verilog with lef
* - update configs
- add patch file for power routing def
* - update the following caravel toplevel views
- gl
- mag
- def
- add caravel power routing def
* Apply automatic changes to Manifest and README.rst
* update gl mag and def for caravel
* Revert "REVERT ME: temporarily match simple_por pin in verilog with lef"
This reverts commit b70c27c69f.
* update caravel gds
* Apply automatic changes to Manifest and README.rst
* Added text and logo cells back into the caravel top level. Put an
isolated ground marker layer on the xres_buf layout. Corrected
the power supply pin names on the gate level verilog netlist of
simple_por in caravel.v. Updated the copyright block text.
Corrected DRC errors in the top level routing.
Co-authored-by: Tim Edwards <tim@opencircuitdesign.com>
* - add openlane patch file to for input buffering workaround
- update configuration of mgmt protect
* mgmt_protect updated
* mgmt_protect updated
* remove some via3 to fix power shorts
Co-authored-by: Marwan Abbas <marwan@ciic.c.catx-ext-efabless.internal>
getting changed by "make ship" because the build is done in a place
where the path pointer to the user_id_programming GDS still points
back to the original caravel repository, not the user project
repository. The user_id_programming GDS was removed (no longer used),
the user_id_programming.mag file was modified to remove the path
pointer to the GDS, and the set_user_id.py script was modified to
make changes directly to the user_id_programming.mag file instead of
the GDS. An additional method was added to the set_user_id.py script
to modify the gate-level verilog/gl/user_id_programming.v to make
the user ID correct for gate-level testbench simulations.