clean. Provides the netgen report, JSON file, and run-time log of
each. Modified the scripts to tee into the run-time log file and to
add the SPICE netlist of the simple_por. Corrected the simple_por
netlist to make the xhigh resistors non-width-specific, since the
width-specific ID mask is not a GDS layer and cannot be reconstructed
from GDS (at least not with the current tech file in magic).
- add timing reports as a tarball per RC corner and *files.txt include the files archived in the *tar.gz
- *global.rpt and *all_viol.rpt could be checked for a summary of the results
- add timing reports as a tarball per RC corner and *files.txt include the files archived in the *tar.gz
- *global.rpt and *all_viol.rpt could be checked for a summary of the results
- signoff summary report (missing LVS results)
- DRC results
- move old CVC results to `./signoff/caravan/standalone_pvr/`
- remove dir `./signoff/caravan/lvs-signoff/` to have all files in dir `./signoff/caravan/standalone_pvr/`
- signoff summary report
- antenna check summary report
- DRC results
- move old CVC results to `./signoff/caravel/standalone_pvr/`
- remove dir `./signoff/caravel/lvs-signoff/` to have all files in dir `./signoff/caravel/standalone_pvr/`
- add input transition range from `1ns` to `4ns` using `-min` and `-max`
- add cap load range from `5pF` to `10pF` using `-min` and `-max`
- add clock uncertainity `0.1`
- remove power pads transition constraints
- add maximum transition `1.5ns` constraint on HD cells at the ss corner
- signoff summary report
- DRC and LVS reports
- STA timing reports for all corners
- generated lib files for all corners
- generated sdf files for all corners
- signoff summary report
- DRC and LVS reports
- STA timing reports for all corners
- generated lib files for all corners
- generated sdf files for all corners
- signoff summary report
- DRC and LVS reports
- STA timing reports for all corners
- generated lib files for all corners
- generated sdf files for all corners
- signoff summary report
- DRC and LVS reports
- STA timing reports for all corners
- generated lib files for all corners
- generated sdf files for all corners
- signoff summary report
- DRC and LVS reports
- STA timing reports for all corners
- generated lib files for all corners
- generated sdf files for all corners
- signoff summary report
- DRC and LVS reports
- STA timing reports for all corners
- generated lib files for all corners
- generated sdf files for all corners
* reharden: caravel
~ shift caravel_clocking due to change in size
~ change the pr boundary of caravel_power_routing mag file
~ regenarate lef of caravel_power_routing
* update pdn for `caravel_clocking` & `digital_pll`
* added script to update and generate the power routing views
* ~ run update_power_routing_views from the caravel root with prboundary
* fix output message
* added power routing lef, mag and gds
* fix update_power_routing_views saving wrong cell name
* reharden: caravel
~ incorperate pdn changes
~ re-extract spefs
* fix caravel_power_routing views
* fix abs path in maglef views
* fix abs path in mag views
add substcut layers in gpio_control_block and mgmt_protect
* generate a new chip_io gds
* regenerate gpio_control_block due to mag and gds not in sync
* reharden: caravel
~ change config to pass clean routing
~ use updated views of macros
* lvs clean views
* add caravel top-level generated sdf for all corners
* fix absolute path for mgmt_core_wrapper
Co-authored-by: kareem <kareem.farid@efabless.com>
Co-authored-by: Bassant Hassan <bassant.hassan@efabless.com>
~ increase width for more spread decaps
+ add or cells to cell exclude
~ change placement density in accordance to area
~ change padding to allow for space for decaps
~ increase height for more spread decap insertion
+ add or cells to cell exclude
~ adjust pdn to have an offset half to pitch
~ change placement density in accordance to area
~ change padding to allow for space for decap insertion
~ enable synth buffering to fix fanout
~ add *buf_1* to no synth list
~ add attribute (* keep *) to the oscillator as dont
touch for yosys
!need to verify that the oscillator remains untouched