Commit Graph

7 Commits

Author SHA1 Message Date
kareem 9ccb0ff2ed reharden!: caravel
~ reimplement based on updated views of the macros
~ change interactive script to call label_macro_pins
~ extract all spef and sdf corners using timing-scripts repo

!important same work arounds as before
2022-10-12 04:45:08 -07:00
kareem 285ef6b642 reharden!: caravel
~ update the following views:
def
mag
verilog
spef(all corners)
+ add the ability to override the interactive script filename
+ add the ability to run openlane regression using regression.config
file
~ change GRT ADJUSTMENT values
~ change pointers to some files for workarounds

!important the interactive script still needs updates
!important this was done using old openlane v0.22 and its matching
pdk
!important known workarounds:
- a custom techlef is used where large metal spacing rules are the
only ones present to avoid violations by the router
- some odd behaviour happening when a macro has a lef view
with a non zero origin. so the power routing cell is (temporarily)
modified to have a zero origin and its placement has been shifted
which doesn't match the power routing mag.
- the old openlane doesn't generate multi spef corners. they
are generated using timing-scripts repo
2022-10-10 04:51:05 -07:00
Tim Edwards aba145e0e2 Made modifications in support of changing the hard-coded default
configuration of GPIO 3 (CSB) from a standard input to a weak
pull-up input.
2022-09-27 20:58:57 -04:00
Kareem Farid c84e1393e7
updates to top level caravel (#59)
* REVERT ME: temporarily match simple_por pin in verilog with lef

* - update configs
- add patch file for power routing def

* - update the following caravel toplevel views
    - gl
    - mag
    - def
- add caravel power routing def

* Apply automatic changes to Manifest and README.rst

* update gl mag and def for caravel

* Revert "REVERT ME: temporarily match simple_por pin in verilog with lef"

This reverts commit b70c27c69f.

* update caravel gds

* Apply automatic changes to Manifest and README.rst

* Added text and logo cells back into the caravel top level.  Put an
isolated ground marker layer on the xres_buf layout.  Corrected
the power supply pin names on the gate level verilog netlist of
simple_por in caravel.v.  Updated the copyright block text.
Corrected DRC errors in the top level routing.

Co-authored-by: Tim Edwards <tim@opencircuitdesign.com>
2022-04-08 09:31:33 -07:00
manarabdelaty 1c18c1dae9 [DATA] Update caravel 2021-11-20 17:28:59 +02:00
manarabdelaty ededa9ed35 [DATA] Update caravel layout with the latest views for the mgmt_protect and mgmt_core 2021-11-19 16:51:28 +02:00
manarabdelaty 2574eada93 [DATA] Add initial caravel layout 2021-11-19 01:37:10 +02:00