Commit Graph

66 Commits

Author SHA1 Message Date
Mohamed Hosni ee17bcf177
Merge branch 'efabless:caravel_redesign' into caravel_redesign 2022-10-11 01:47:06 -07:00
mo-hosni df05079b6f update houskeepong powere netlst and fixed some antenna violations 2022-10-11 01:46:23 -07:00
Mohamed Shalan 4f1ee965a9
Merge pull request #170 from efabless/update_por_lef
Updated the LEF of simple_por
2022-10-11 10:40:11 +02:00
Mohamed Shalan 344f806980
Merge pull request #166 from efabless/gpio_control_block-sparecell
gpio_control_block sparecell
2022-10-11 10:39:50 +02:00
Tim Edwards 67a12304fa Updated the LEF of simple_por, which was generated without the
"-hide" option, but was also missing the metals 2 and 3 over the
substrate contact, allowing routes on those layers to short to
the actual layout.  The new LEF properly reflects the current
version of the POR layout.
2022-10-10 20:58:07 -04:00
kareem f4218ddde9 reharden!: gpio_control_block
- reimplement using a sparecell
- reimplement using newest open_pdks

!important using openlane pre odb with some local patches which
most if not all are merged in the current head of openlane however
still takes effort to update the interactive script to be latest
openlane compatible

!important override abstract lef generated by openlane. openlane
 generates lef and mag that contain def BLOCKAGE layers that cause
congestions during top level routing
2022-10-10 05:42:29 -07:00
Mohamed Hosni 40098f693e
Merge branch 'efabless:caravel_redesign' into caravel_redesign 2022-10-10 05:08:33 -07:00
Mohamed Hosni fa441babea
Merge branch 'efabless:caravel_redesign' into caravel_redesign 2022-10-10 01:24:24 -07:00
mo-hosni 7a7690ba10 Update housekeeping 2022-10-10 01:21:51 -07:00
mo-hosni 7e5891dd9f Update mgmt_protect 2022-10-10 01:19:40 -07:00
Tim Edwards 2459b3583e Updated all views of chip_io and chip_io_alt based on the abstract
view of constant_block which was recently merged into the repository.
The constant_block instance positions and connections were modified
slightly to avoid routing over obstruction areas.
2022-10-09 14:20:43 -04:00
Mohamed Shalan 7538c8c776
Merge pull request #161 from efabless/chip_io_rework 2022-10-09 16:31:28 +02:00
Tim Edwards eceb71ee04 Added GDS, DEF, and LEF views of both chip_io and chip_io_alt. 2022-10-08 22:24:38 -04:00
mo-hosni dde6e034e0 added constant_block view 2022-10-08 12:05:53 -07:00
mo-hosni d6ca7f9091 rehardened housekeeping after rtl update, and fixed all hold and transition violations. 2022-10-07 16:59:01 -07:00
Mohamed Hosni 5c38e38767
Merge branch 'efabless:caravel_redesign' into caravel_redesign 2022-10-07 16:52:16 -07:00
kareem 6d1d618974 reharden!: gpio_control_block
- rtl updated
~ add one column to the right to pass placement congestion
~ density adjusted (probably has no effect)
+ manually add isosubstrate layer in mag and gds from older iterations

!important still need to run dynamic simulations
!important depends on some updates to openlane
!important need to be able to recreate using newer openlane versions
2022-10-07 05:02:14 -07:00
mo-hosni 9c850bf94b rehardened housekeeping 2022-10-05 12:35:03 -07:00
mo-hosni fcc009e65a rehardeneded mgmt_protect 2022-10-05 12:26:24 -07:00
kareem aaa3b863e5 reharden!: gpio_control_clock
- add met5 obs to avoid drc with the top level pdn

!important: still need to use the latest openlane to replicate
2022-10-05 07:03:11 -07:00
kareem 85f7f86c4e reharden!: gpio_control_block
- high level changes:
* add larger buffers on output ports
* add buffers on input ports
* adjust sdc file increasing output load and setting a high transition

- detailed changes:
* add interactive script for openlane where the order of events is a bit shuffled
	- to add obstruction before pdn
	- to manually insert buffers on some ports
	- to manually remove buffers inserted by synthesis on for example serial_clock_out
* change openlane config adding extra row and columns to increase the space and fit the
added buffers
* change config to enable buffering
* increase density for better placement?
* change the cell exclude list. some excluded cells didn't make sense
* ef decap cells break dynamic sims?
* add custom pdn script for to duplicate the old pdn

- misc changes:
* fix openlane makefile to properly detect interactive script

!important still need to run dynamic simulations
!important depends on some updates to openlane
2022-09-27 07:09:26 -07:00
kareem c1e0d5ba06 openlane!: reharden gpio_control_block
update gpio_control_block config for new openlane versions:
- disable `SYNTH_BUFFERING` and `SYNTH_SIZING` to limit the design size
and fit the floorplan
- change `SYNTH_STRATEGY` to `AREA 0` to minimize design cells
- disable `PL_RESIZER_TIMING_OPTIMIZATIONS` and
enable `GLB_RESIZER_TIMING_OPTIMIZATIONS`
- remove `FP_IO_*` and replace them with `FP_DEF_TEMPLATE` for io placement
- set `DECAP_CELL` to not use ef decaps.. i think that was for simulations?
- enable some turned off `QUIT_*` variables
- replace deprecated variables such as `GLB_RT_*`
- customize `pdn.tcl` to force pdn straps to follow the old pattern
- replace `$script_dir` with `$::env(DESIGN_DIR)`

!IMPORTANT - still need to run dynamic simulations
2022-09-14 11:06:23 -07:00
kareem ac1928a45b harden: gpio_control_block with updated rtl
TODO: run full verification
2022-08-15 02:29:01 -07:00
Kareem Farid 9ddb806293
gpio_control_block constrains fix (#69)
Co-authored-by: Marwan Abbas <marwan@ciic.c.catx-ext-efabless.internal>
2022-04-15 11:50:54 -07:00
R. Timothy Edwards 71600440bc
Caravan top lvs (#67)
* - update caravan configuration
* change correct gpio_default blocks instance names
* implement powerrouting work around
* place spare logic blocks
* keep the history of runs and sym link last/final one

* - update caravan mag, def and gl views
- add fake power routing cell in the rtl as a placeholder for openlane
  to prevent routing on that cell
- fix some syntax errors in chip_io_alt
- match simple_por lef pins with mag by regenerating it

* Apply automatic changes to Manifest and README.rst

* add caravan power routing lef

* - update mag and def view of caravan
- add_macro_placement for fake cell

* Added back the power routing to Caravan, fixed DRC errors, ran LVS,
corrected placement of isolated substrate regions, and replaced the
signal routing for the analog lines.  Be aware that merging with
main may cause issues with the mgmt_protect.mag file and its
subcells mprj2_logic_high.mag and mprj_logic_high.mag.  It may be
worth cherry-picking the files to merge and exclude those layouts.

Co-authored-by: kareem <kareem.farid@efabless.com>
Co-authored-by: kareefardi <kareefardi@users.noreply.github.com>
Co-authored-by: Jeff DiCorpo <42048757+jeffdi@users.noreply.github.com>
2022-04-14 15:05:16 -07:00
Kareem Farid dcebeed7e7
Mgmt protect update (#58)
* - add openlane patch file to for input buffering workaround
- update configuration of mgmt protect

* mgmt_protect updated

* mgmt_protect updated

* remove some via3 to fix power shorts

Co-authored-by: Marwan Abbas <marwan@ciic.c.catx-ext-efabless.internal>
2022-04-08 09:29:49 -07:00
Kareem Farid e3b9a99154
- update gpio_control_block config (#57)
- update gpio_control_block views
- gitignore gds/*gds
2022-04-08 09:27:51 -07:00
manarabdelaty 981043cb7b [DATA] Update mgmt_protect/gpio_control_block to remove buffers after tri-state cells 2021-12-24 21:06:58 +02:00
jeffdi d4e6ed5684 adding user_project_wrapper empty files -- gds & lef 2021-12-16 12:29:35 -08:00
manarabdelaty bd88221d17 [DATA] Update caravel_clocking 2021-12-07 13:36:56 +02:00
manarabdelaty 966b1f22bb [DATA] Update digital_pll 2021-12-07 13:19:02 +02:00
manarabdelaty aa766f9144 [DATA] Update caravel_clocking module 2021-12-05 19:44:28 +02:00
manarabdelaty ef1019b62a [DATA] Update caravel_clocking 2021-12-02 22:50:20 +02:00
manarabdelaty 0067bd5b7c [DATA] Update caravel_clocking/digital_pll/housekeeping 2021-12-02 21:09:43 +02:00
manarabdelaty c4efcec989 [DATA] Update housekeeping views 2021-11-30 13:00:33 +02:00
manarabdelaty 8b1c5df909 [DATA] Update caravel_clocking module (timing clean) 2021-11-25 15:23:01 +02:00
manarabdelaty 05278ec738 [DATA] Update HK views (timing clean) 2021-11-25 12:54:22 +02:00
manarabdelaty 83e150bf25 [DATA] Add spare_logic_block 2021-11-24 20:36:23 +02:00
manarabdelaty 38f64d08a3 [DATA] Add user_analog_project_wrapper and chip_io_alt gds/lef views 2021-11-22 23:08:25 +02:00
manarabdelaty 331fdee2bb [DATA] Update HK module (li1 routing: 249um) 2021-11-20 15:13:16 +02:00
manarabdelaty 5cd3843f00 [DATA] Update gpio_control_block (li1 used 2um) 2021-11-20 14:43:20 +02:00
manarabdelaty 37fb2d6766 [DATA] update caravel_clocking module (removed long li1 routes, in total it used 8um from li1) 2021-11-20 13:07:23 +02:00
manarabdelaty bf6ad67934 [DATA] Update gpio_control_block pin order to fix shorts at the top level 2021-11-19 13:13:24 +02:00
manarabdelaty 581a22de6a [DATA] Update mgmt_protect (removed all li1 routing ) 2021-11-19 13:11:18 +02:00
manarabdelaty 2574eada93 [DATA] Add initial caravel layout 2021-11-19 01:37:10 +02:00
manarabdelaty 61bf3c651e [DATA] Update mgmt_protect pin placement 2021-11-19 01:33:11 +02:00
manarabdelaty 53b3a9013e [DATA] Update HK pin placement 2021-11-19 01:30:14 +02:00
manarabdelaty 37a07e291b [DATA] Update digital_pll pin placement to have it align with the HK 2021-11-19 01:28:40 +02:00
manarabdelaty 64bdd6230d [DATA] Update caravel_clocking module floorplan 2021-11-19 01:26:29 +02:00
manarabdelaty 3cc88cd7fd Add USE POWER/USE GROUND properties to the simple_port lef view 2021-11-17 17:57:23 +02:00