Commit Graph

3 Commits

Author SHA1 Message Date
mo-hosni 8d6cfe6e2b reharden gpio_defaults_block. Changed the power stripes to be on Metal3. 2023-02-27 07:34:33 -08:00
Passant 59cdcf471d remove `./spef` and `./sdf` directories at the top-level
add them to `./signoff/openlane-signoff/` as they are generated from openlane
2022-10-19 14:59:36 -07:00
Passant 78cec109cc add signoff sdc dir
move sdc generated from openlane to signoff/<design name>/openlane-signoff
rearrange spef directory with RC corners spefs
2022-10-12 07:28:32 -07:00