Commit Graph

7 Commits

Author SHA1 Message Date
marwaneltoukhy a5d36add2f new caravel gds views and updated mgmt_core_wrapper maglef in /mag directory 2022-11-10 04:58:00 -08:00
Marwan Abbas bbb6bf775c
Caravel redesign new top (#300)
* reharden: caravel

~ shift caravel_clocking due to change in size
~ change the pr boundary of caravel_power_routing mag file
~ regenarate lef of caravel_power_routing

* update pdn for `caravel_clocking` & `digital_pll`

* added script to update and generate the power routing views

* ~ run update_power_routing_views from the caravel root with prboundary

* fix output message

* added power routing lef, mag and gds

* fix update_power_routing_views saving wrong cell name

* reharden: caravel

~ incorperate pdn changes
~ re-extract spefs

* fix caravel_power_routing views

* fix abs path in maglef views

* fix abs path in mag views
add substcut layers in gpio_control_block and mgmt_protect

* generate a new chip_io gds

* regenerate gpio_control_block due to mag and gds not in sync

* reharden: caravel

~ change config to pass clean routing
~ use updated views of macros

* lvs clean views

* add caravel top-level generated sdf for all corners

* fix absolute path for mgmt_core_wrapper

Co-authored-by: kareem <kareem.farid@efabless.com>
Co-authored-by: Bassant Hassan <bassant.hassan@efabless.com>
2022-10-18 17:24:07 -07:00
Tim Edwards 714fc1cd13 Fixes to chip_io to fix LVS issues. Also added back top level
pins on the pads, and reinstated the script that does that from
another branch that was not merged.
2022-10-18 10:29:43 -04:00
Tim Edwards 1035e8b469 Updated caravel and caravan layouts to reflect the simple change
to housekeeping and the management core wrapper to separate the
wb_cyc_i signal and connect to new signal hk_cyc_o on the
management core.  Also:  Fixed a dangling input (user_clock) on
the housekeeping (minor error caused by the earlier refactoring
and unnoticed because there is no testbench covering that
function).
2021-11-30 10:05:43 -05:00
Tim Edwards 6eb8bb54de Several more LVS corrections, including fixing a label in chip_io that
got removed from its net by a chang in the LEF view of an I/O pad, and
a lack of declaration of an array to attach to pwr_ctrl_out in the
verilog, which is valid verilog but netgen can't know the bus size
without the no-connect net being declared.  The remaining issue has to
do with separation of ground domains in the mgmt_protect block.
2021-11-21 22:58:39 -05:00
Tim Edwards 6570429234 Continued work on the power routing. Also updated the management
core wrapper view with the LEF view from caravel_pico.
2021-11-20 22:04:46 -05:00
Tim Edwards d5ef31e391 Added an empty management core wrapper to the caravel top level. 2021-11-12 12:17:52 -05:00