Interconnection extensions
==========================
2019-09-30 11:38:02 -05:00
This section introduces extensions on the architecture description file about existing interconnection description.
2019-09-30 11:00:46 -05:00
Directlist
----------
2019-09-30 11:38:02 -05:00
The original direct connections in the directlist section are documented here_. Its description is given below:
2019-09-30 11:00:46 -05:00
.. _here: http://docs.verilogtorouting.org/en/latest/arch/reference/?highlight=directlist#direct-inter-block-connections
.. code-block :: xml
<directlist>
<direct name="string" from_pin="string" to_pin="string" x_offset="int" y_offset="int" z_offset="int" switch_name="string"/>
</directlist>
.. note :: These options are required
Our extension include three more options:
.. code-block :: xml
<directlist>
<direct name="string" from_pin="string" to_pin="string" x_offset="int" y_offset="int" z_offset="int" switch_name="string" interconnection_type="string" x_dir="string" y_dir="string"/>
</directlist>
2019-09-30 11:29:42 -05:00
.. note :: these options are optional. However, if *interconnection_type* is set *x_dir* and *y_dir* are required.
* **interconnection_type** : [`` NONE `` | `` column `` | `` row `` ], specifies if it applies on a column or a row ot if it doesn't apply.
2019-09-30 11:00:46 -05:00
* **x_dir** : [`` positive `` | `` negative `` ], specifies if the next cell to connect has a bigger or lower x value. Considering a coordinate system where (0,0) is the origin at the bottom left and *x* and *y* are positives:
2019-09-30 11:38:02 -05:00
* x_dir="positive":
2019-09-30 11:00:46 -05:00
2019-09-30 11:38:02 -05:00
* interconnection_type="column": a column will be connected to a column on the **right** , if it exists.
2019-09-30 11:00:46 -05:00
2019-09-30 11:38:02 -05:00
* interconnection_type="row": the most on the **right** cell from a row connection will connect the most on the **left** cell of next row, if it exists.
2019-09-30 11:00:46 -05:00
2019-09-30 11:38:02 -05:00
* x_dir="negative":
2019-09-30 11:00:46 -05:00
2019-09-30 11:38:02 -05:00
* interconnection_type="column": a column will be connected to a column on the **left** , if it exists.
2019-09-30 11:00:46 -05:00
2019-09-30 11:38:02 -05:00
* interconnection_type="row": the most on the **left** cell from a row connection will connect the most on the **right** cell of next row, if it exists.
2019-09-30 11:00:46 -05:00
* **y_dir** : [`` positive `` | `` negative `` ], specifies if the next cell to connect has a bigger or lower x value. Considering a coordinate system where (0,0) is the origin at the bottom left and *x* and *y* are positives:
2019-09-30 11:38:02 -05:00
* y_dir="positive":
2019-09-30 11:00:46 -05:00
2019-09-30 11:38:02 -05:00
* interconnection_type="column": the **bottom** cell of a column will be connected to the next column **top** cell, if it exists.
2019-09-30 11:00:46 -05:00
2019-09-30 11:38:02 -05:00
* interconnection_type="row": a row will be connected on an **above** row, if it exists.
2019-09-30 11:00:46 -05:00
2019-09-30 11:38:02 -05:00
* y_dir="negative":
2019-09-30 11:00:46 -05:00
2019-09-30 11:38:02 -05:00
* interconnection_type="column": the **top** cell of a column will be connected to the next column **bottom** cell, if it exists.
2019-09-30 11:00:46 -05:00
2019-09-30 11:38:02 -05:00
* interconnection_type="row": a row will be connected on a row **below** , if it exists.
2019-09-30 11:00:46 -05:00
Example
-------
2019-09-30 11:38:02 -05:00
For this example, we will study a scan-chain implementation. The description could be:
2019-09-30 11:00:46 -05:00
.. code-block :: xml
<directlist>
<direct name="scff_chain" from_pin="clb.sc_out" to_pin="clb.sc_in" x_offset="0" y_offset="-1" z_offset="0" interconnection_type="column" x_dir="positive" y_dir="positive"/>
</directlist>
2019-09-30 11:29:42 -05:00
:numref: `fig_p2p_exple` is the graphical representation of the above scan-chain description on a 4x4 FPGA.
2019-09-30 11:00:46 -05:00
2019-09-30 11:29:42 -05:00
.. _fig_p2p_exple:
2019-09-30 11:00:46 -05:00
.. figure :: ./figures/point2point_example.png
2019-09-30 11:29:42 -05:00
2019-09-30 11:38:02 -05:00
An example of scan-chain implementation
2019-09-30 11:00:46 -05:00
2019-09-30 11:38:02 -05:00
In this figure, the red arrows represent the initial direct connection. The green arrows represent the point to point connection to connect all the columns of CLB.
2019-09-30 11:00:46 -05:00
Truth table
-----------
2019-09-30 11:38:02 -05:00
A point to point connection can be applied in different ways than showed in the example section. To help the designer implement his point to point connection, a truth table with our new parameters id provided below.
2019-09-30 11:00:46 -05:00
:numref: `fig_p2p_trtable` provides all possible variable combination and the connection it will generate.
2019-09-30 11:29:42 -05:00
.. _fig_p2p_trtable:
2019-09-30 11:00:46 -05:00
.. figure :: ./figures/point2point_truthtable.png
2019-09-30 11:29:42 -05:00
2019-09-30 11:38:02 -05:00
Point to point truth table